Friday, 21/08/2026 | 01:35 GMT+7
The new factory is expected to have a 3.4 GW capacity, almost 1 GW more compared to the capacity produced by all Taiwanese manufacturers.
The chairman of the company, Mr Lin Kun claims that 620 MW-worth of solar cells will be produced and the capacity will reach 800 MW by the end of the year.

The plant will be built in three or four years and will create 1, 000 jobs in the beginning, with the prospect of increasing to 4,000 employees. Thus, with the new solar cell plant, Neo Solar Power has great chances of becoming one of the top three solar cell manufacturers in the world.
The plant was launched in the presence of top government officials as well as representatives of other solar cell manufacturers. Mr Vincent Siew, Vice-president of Neo Solar Power commented that “I made the decision to build STSP 20 years ago, back when I was still at the Ministry of Economic Affairs, and each time I see a new company moving into it, I feel a sense of warmth and joy.”
Mr Huang Chung Chiou, deputy minister of economic affairs,
was also there to point out the importance of biofuels and his support for a
cleaner environment. Moreover, the head of the company, Mr Lin, is in favor of
the idea that
Vietnam Energy Efficiency Community: Develop a Sustainable Ecosystem for Energy Efficiency and Conservation
30/07/2026
Contract Award Notice - Support the development of energy management systems and capacity building (Package C2.2.11)
Contract Award Notice - Develop/Upgrade MRV Systems for Selected Industrial Sectors – Package C2.1.26
Hanoi – Thanh Hoa Beer Optimizes Energy Efficiency in Production
Bosch Vietnam Optimizes Energy to Advance Sustainable Manufacturing
Optimizing Energy Utilization in Every Production Stage
Contract Award Notice - Providing technical support, training, and communication on energy efficiency for industrial zones and clusters in Vietnam (Package C2.2.13)
Conference on Energy Efficiency and Conservation in 2026